Rewiring & new supplies

Wiring planned
around your property.

From one new circuit to a full or partial rewire, the work is designed around how the property is used, where disruption can be reduced and what the installation needs for the years ahead.

New circuits neatly connected and labelled at an upgraded consumer unit by SL4 Electrical Services
Genuine SL4 workHouse rewires, partial rewires and new electrical circuits

What’s included

Professional from
start to finish.

Rewires and new circuits are available across Dudley, Sedgley, Wolverhampton, Halesowen, Tipton, Willenhall and surrounding areas. A site visit is usually needed so the existing installation, routes, finishes and intended loads can be assessed properly.

01

Full & partial rewires

Older or unsuitable wiring can be replaced throughout the property or in agreed areas, with the scope planned around occupation, access and the finish required.

02

Extensions & renovations

Sockets, lighting, heating controls and fixed equipment are planned before walls and finishes close, helping the electrical work fit the wider building programme.

03

Dedicated new circuits

Cookers, ovens, showers, garages, outbuildings and other equipment are assessed for a correctly sized supply, suitable protection and local isolation.

04

Testing & certification

New work is inspected and tested, circuit schedules and labels are completed and the appropriate electrical certificate is supplied.

Plan before the first chase

A rewire is more than
replacing old cable.

The best time to decide socket positions, lighting controls, data points and future electrical loads is before work starts. A clear plan reduces changes, limits avoidable damage and produces an installation that suits everyday life.

01 · Scope

Full, partial or one new circuit?

An inspection helps separate wiring that genuinely needs replacement from circuits that may remain serviceable.

02 · Practical use

Plan where power is actually needed

Furniture, appliances, home working, outdoor equipment and future upgrades all affect the right number and position of outlets.

03 · Disruption

Agree access and finishes early

Occupied homes, floor coverings and decoration need careful sequencing. The expected routes and making-good responsibilities are explained before work begins.

Simple process

What happens next

  1. 1Send the property address, the work you are planning and any drawings or room layouts.
  2. 2I’ll arrange a survey to inspect the existing installation, access and likely cable routes.
  3. 3You receive a clear scope covering circuits, accessories, exclusions and the planned sequence.
  4. 4The installation is completed in stages, then inspected, tested, labelled and certified.

Helpful answers

Common questions
answered clearly.

Practical information before you arrange a quotation or site visit.

How do I know whether my house needs a full rewire?

Age alone does not provide the answer. The condition and type of wiring, earthing, protective devices, alterations and test results all matter. An inspection or EICR can help establish whether a full rewire, targeted improvements or no immediate replacement is the sensible option.

Can you rewire part of a property rather than the whole house?

Yes, where the existing circuits and proposed work make a partial rewire appropriate. The retained installation still needs to be compatible with the new work and capable of being tested satisfactorily.

Can a rewire be completed while the home is occupied?

Sometimes, but it normally takes more planning and can take longer. Access, furniture, floor coverings, temporary power and the order of rooms all need to be agreed before work starts.

Who makes good the walls after wiring?

Cable routes and the expected level of disturbance are discussed in the quotation. The scope will state whether any chasing or lifting is included and whether plastering, decorating or other making-good is by others.

Will a new circuit need its own protective device?

Normally, yes. The circuit design considers the connected load, cable route, disconnection times, RCD requirements and the existing consumer unit. If the current board cannot accept the work safely, the options will be explained before quoting.

Will I receive a certificate after a rewire or new circuit?

Yes. New circuits and rewiring are inspected and tested, with an Electrical Installation Certificate supplied. Any applicable notification requirements are also explained.

Let’s talk

Need a straightforward quote?

Answer a few quick questions, see which photos will help and open a completed message in WhatsApp.

Start guided enquiry Or call Shaun →
WhatsAppGet a quote
Call nowGet a quote