Inspection & testing

EICRs and
electrical testing.

Thorough inspection and testing with clear results—not rushed box-ticking. You’ll know what is safe, what needs attention and what can wait.

Megger electrical test instrument being used during an EICR by SL4 Electrical Services
Genuine SL4 workEICR and electrical testing

What’s included

Professional from
start to finish.

Suitable for landlords, homeowners, buyers and businesses across Dudley and the Black Country. Testing is planned carefully and findings are explained in plain English, with remedial options where needed.

01

Detailed inspection

Every accessible circuit is investigated, with checks and electrical tests carried out at selected accessible points throughout each room and area of the property.

02

Circuit testing

Circuits are electrically tested to assess continuity, insulation resistance, polarity, fault protection and RCD operation.

03

Clear observations

Any issues are recorded with the correct classification and explained without unnecessary alarm or confusing jargon.

04

Digital certificate

You receive a professional report recording circuit details, test results, observations and the overall outcome.

Commercial Electrical Inspection & Testing

Commercial &
Industrial EICRs

SL4 Electrical Services brings experience in the inspection and testing of larger commercial and industrial electrical installations.

This includes three-phase distribution systems, plant rooms, switchgear, earthing arrangements, control equipment and electrical supplies associated with commercial heating and plant.

Electrical Installation Condition Reports help identify deterioration, defects and potential safety issues before they become more serious, while giving businesses a clear picture of the condition of their electrical installation.

Suitable for
  • Commercial premises
  • Landlords
  • Workshops
  • Offices
  • Retail
  • Hospitality
  • Plant rooms
  • Industrial premises

These photographs illustrate inspection-and-testing experience on existing commercial installations. They are not presented as plant, equipment or systems designed or installed by SL4 Electrical Services.

Need a Commercial EICR?Contact SL4 Electrical Services to discuss your premises and inspection requirements.
Discuss your premises

How the inspection works

A proper EICR is a
room-by-room investigation.

An EICR is much more than looking at the consumer unit. I identify and investigate every accessible circuit, then work through the property testing at selected accessible electrical points in every room and area where electricity is present.

The power is safely isolated in stages while I test the circuits and inspect the installation. This allows me to assess the wiring, accessories and protective devices, trace irregularities and record accurate results for the final report.

  1. 01Consumer unit & supplyEarthing, bonding, protective devices and circuit details are checked first.
  2. 02Every accessible circuitEach circuit is identified, investigated and electrically tested in stages.
  3. 03Every room & areaSelected accessible sockets, lights, switches and fixed equipment are checked throughout the property.
  4. 04Results & reportTest results and observations are recorded, classified and explained clearly.

Safety & responsibilities

Why an EICR
really matters.

Electrical installations deteriorate with age and use. An EICR can uncover overloaded circuits, electric-shock risks, fire hazards, defective work and inadequate earthing or bonding before they cause harm.

Rental properties in England

At least every five years

Landlords must arrange inspection and testing by a qualified person at least every five years, or sooner when the previous report states. Required remedial or investigative work must normally be completed within 28 days, or sooner if the report specifies.

Read the government guidance ↗
Owner-occupied homes

Recommended every ten years

There is no universal legal deadline for homeowners, but periodic inspection is recommended every ten years—and when buying, selling, after major changes or whenever the installation’s condition is uncertain.

Read the safety guidance ↗
Businesses & workplaces

Based on risk and condition

Workplace electrical systems must be maintained safely. Inspection frequency should reflect the installation, its environment, use, condition and previous findings rather than relying on one interval for every premises.

Read the HSE guidance ↗

Understanding the report

What do the EICR codes mean?

C1, C2 or FI make an EICR unsatisfactory and require action. A C3 is a recommendation that would improve safety but does not by itself make the report unsatisfactory.

C1Danger present

Immediate risk of injury. The danger should be made safe without delay.

C2Potentially dangerous

Urgent remedial action is needed to remove the potential danger.

FIFurther investigation

Investigation is required without delay because safety cannot yet be confirmed.

C3Improvement recommended

Not dangerous on its own, but an improvement would increase safety.

Not sure when your next EICR is due?Use the free checker for a status and estimated price guide.
Check your EICR

Simple process

What happens next

  1. 1Tell me the property type, postcode and reason for the inspection.
  2. 2I’ll confirm what access is needed and arrange a suitable time.
  3. 3Power is turned off in stages while circuits are safely tested.
  4. 4You receive the report plus clear advice on any recommended work.

Instant online guide

Check your EICR status & price

See whether a report may be current, due soon or overdue, then get an estimated price and inspection time.

Try the free tool

Helpful answers

Common questions
answered clearly.

Practical information before you arrange a quotation or site visit.

Will the power need to be turned off during an EICR?

Yes. Circuits need to be safely isolated in stages so they can be tested properly. I will explain the process beforehand so computers, alarms and other sensitive equipment can be prepared.

What information do you need to quote for an EICR?

Send the property postcode and type, the reason for the inspection and a clear photo of the consumer unit. A previous report is also useful because it shows the number and type of circuits.

What happens if the report finds a problem?

The report records each observation and its classification. I explain what it means in plain English and can provide a clear quotation for remedial work where required.

Let’s talk

Need a straightforward quote?

Answer a few quick questions, see which photos will help and open a completed message in WhatsApp.

Start guided enquiry Or call Shaun →
WhatsAppGet a quote
Call nowGet a quote